Skip to content
Croydon ConcretingCity of Maroondah

Croydon and the City of Maroondah

Concrete removal and replacement in Croydon

Failed concrete and paving cut, broken and carted across Maroondah, then replaced over a rebuilt base. The break-out and disposal ride at $35 per m2 on the new surface rate.

Concreters spreading wet concrete over steel mesh
Concreters spreading wet concrete over steel mesh
Recent work
Site measure Free, at your place
Quote Fixed, in writing
Steel In every slab
Area City of Maroondah only

$130 to $220 per m², supplied and laid. A guide until the block is measured; the written quote holds.

Half the concreting in the outer east is replacement, because the suburbs were built out decades ago and the original surfaces are at the end of their lives. Cracked driveways that drop at the crossover, paths lifted by tree roots, shed slabs that were never thick enough: they all come out the same way, and what matters is what happens before the new concrete goes down.

The break out

The old surface is broken out, loaded and carted for disposal, including the mesh or reo in it if the original crew used any. Edges against buildings and fences are cut clean rather than crashed through, and services under the old slab are located before anyone swings a breaker.

The part that stops it happening again

A failed slab is a message about the ground under it. Replacement is the one chance to answer it: soft spots dug out, base material brought in and compacted where the ground needs it, falls corrected so water stops pooling, and steel mesh in the new slab as standard. The specification sets out exactly what goes under every surface we pour.

What it costs

Removal adds $35 per square metre, including disposal, to the rate for whatever replaces it: a replaced driveway runs $130 to $220 per square metre all-in by finish, a replaced path $125 to $165. Treat every rate as a guide until the block is measured; the quote written after the site measure holds. The cost guide breaks the numbers down and the calculator prices your job with removal switched on.

Concreters spreading wet concrete over steel mesh
The new surface going down
Steel reinforcement mesh tied before a concrete pour
Steel in every replacement slab

Where we pour concrete removal and replacement

Croydon, Croydon Hills, Croydon North, Croydon South, Heathmont, Ringwood and nowhere else: one council, known inside out.

The running order

From first call to finished concrete

  1. 01

    Measure and mark

    We walk the job with you, pull the tape over it, check falls and access, and hold finish samples against the house where they can be judged honestly.

  2. 02

    One number, in writing

    The quote is itemised line by line to the published specification and it does not move. Any Maroondah crossover permit is flagged before you commit to a thing.

  3. 03

    Pour days

    Break out if something old is coming up, the base corrected and compacted, mesh set on chairs, then the concrete. Most homes take a day or two on site.

  4. 04

    To the line

    Joints sawn straight, stone finishes washed and sealed once cured, and the surface carrying cars a week after the pour.

Common questions

Concrete removal and replacement questions

What does concrete removal cost?

As part of a replacement job, removal adds $35 per square metre to the new surface's rate, including breaking out, loading and disposal. A replaced driveway therefore runs $130 to $220 per square metre all-in by finish. Treat every rate as a guide until the block is measured; the quote written after the site measure holds.

Why did my old concrete fail?

Around Croydon it is nearly always the ground, not the concrete. The clay of the foothills swells through winter and shrinks over summer, and slabs poured decades ago with little base preparation and no steel follow that movement until they crack and drop. The fix is a corrected, compacted base and steel mesh, which is what every replacement gets.

Can you remove concrete without replacing it?

Replacement is our work; straight demolition with nothing poured after it is generally better priced by a demolition contractor. Where we pour the new surface, the removal is folded into the one quote and the one clean-up.

How long does a replacement take?

Most residential replacements are one to two days on site, break out and cart away, correct and compact the base, then pour. Cure time runs after that, with vehicles off a new driveway for seven days.

One fixed written quote after a free site measure.

Call (03) 7500 5497 Get a quote