Skip to content
Croydon ConcretingCity of Maroondah
  1. Home
  2. Areas

Where we work

Maroondah is the whole map: 6 suburbs, one council. That focus means MCC-501, the permit portal and the inspection routine are second nature, and the quoting is faster and surer for it.

Maroondah permits

Maroondah City Council requires written consent and a vehicle crossing permit before a crossover, the section between your property boundary and the road, is built, widened, relocated or reconstructed. Applications go through the council’s online eServices portal; consent applications are assessed in around ten business days and the permit itself is typically issued within two, valid for three months. Residential crossings are built to the council’s standard drawing MCC-501, between 3.0 and 4.0 metres wide, and generally one crossing is permitted per property unless the frontage exceeds 20 metres. Clearances apply from pits, poles, street trees and other assets in the nature strip. Council inspects the work twice: a pre-pour inspection, booked with at least 24 hours’ notice, before any concrete is poured, and a final inspection on completion. Council charges a permit fee that moves from year to year; the current figure goes into your quote, along with written confirmation of exactly what your job requires before anything is booked. The whole process, widths, inspections and timeframes included, is walked through in our Maroondah concreting permit guide.

Council permit information

Quote in Maroondah

A few details is all it takes; the site measure gets arranged and the fixed quote follows in writing.

Or phone (03) 7500 5497

Where we pour

The City of Maroondah, and only that

Six suburbs, one town hall. Maroondah's rules are the only rules we work under, and every one of these postcodes is home turf.

Croydon, Croydon Hills, Croydon North, Croydon South, Ringwood and Heathmont. City of Maroondah council.

About our service area

One fixed written quote after a free site measure.

Call (03) 7500 5497 Get a quote